Scope of works

Sniffers Group provided trommel services to ameliorate soils for the client. Approximately 6000 tonnes were put through both the -40 barrel and the -15 barrel with the final product being utilised as course basin sand. Overall, the project went extremely well even with adverse soil moisture for the 15ml we preserved to make the job happen.

Equipment Utilised

To achieve the goals of the project we used a trommel, 23T excavator and a highly trained supervisor that was to ensure everything ran smoothly.