top of page

Gold Coast Bio Basins

~ Client ~

Durack Civil

~ Location ~

Basin 1: Bellagio Crescent, Upper Coomera

Basin 2: Guara Grove, Pimpama

Basin 3: Jacobs Ridge Road, Ormeau

Basin 4: Kingscrest Drive, Reedy Creek

Basin 5: Cardwell Street, Upper Coomera

Basin 6: 338A Burleigh Connection Road, Burleigh Heads

~ Duration ~

May 2023 - April 2024

Scope of Works

This project consisted of constructing and upgrading 6 bio retention basins for Gold Coast City Council. The scope of works included testing and confirming hydraulic permeability of existing basins, supply and installation of clay capping layers as required, underdrainage installation and upgrades, acid sulphate management, concrete structure construction, specialist sand layers and extensive landscaping. The 6 basins included Burleigh Heads, Pimpama, Ormeau, Reedy Creek and 2 in Coomera. The works require significant temporary drainage and erosion and sediment control planning to limit impacts on existing waterways. 

Equipment Utilised

Overall, the project went swimmingly with Sniffers having provided experienced supervisors to navigate the construction of each bio basin along with 5T, 8T, 14T, 23T & Long Reach Excavators, Trucks of various sizes, Posi-tracks, and skilled labourers. 